CONSTRUCTION
Seal concrete slab against moisture. Roll out foam sheeting to conform
to slab. Tape seams of foam. Loosely lay bottom layer of ply directly
on foam. Stagger seams. 1" (25.40 mm) continuous thread wood
deck screws with counter sinking heads. Tape or patch screw heads
and sand seams to realize smooth surface.
Note: If you plan to remove and recycle your subflooring at a future date, do not fill screw holes. Tape
over them for easy removal later.
|