SPRINGSTEP IV

ORDER OF CONSTRUCTION
• Water seal concrete with 12 mil Vapor Barrier
• Peel and Stick foam forms and place on panel* (6 forms) (see Illustration 1)
• Invert panels and press together staggering seam (see Illustration 2)
* Peel and stick not necessary with pre-assembled Springstep IV

SPRINGSTEP IV (Foam Forms) Installation Instructions
(Foam forms and Springstep IV panels may ship separately.)
Pre-assembled Springstep IV is ready for installation.

Step 1: Peel adhesive paper off of "L" shaped foam forms and apply in pattern illustrated (see left) to the rough side of the board.

Step 2: After affixing foam forms, flip boards over so that the smooth side is facing up. Starting in one corner with a full board, work left to right across the room cutting the last board if necessary to fit your width.

Press boards into each other making sure to stagger seams. See image.

Every other row should begin with a full board. Rows should alternate starting with full boards and half boards as illustrated to the left.

Leave 1/2" gap at walls.

Floor is complete when you reach the walls or the
desired size.

Transition pieces, corners and edging are available.

 

Foam Block Layout

Foam blocks and Springstep IV panels may ship separately.

Foam blocks must be attached by customer using the following instructions. Attach foam blocks in the pattern with liquid nail or contact adhesive.

TIP: Use spray contact adhesive to speed assembly. After affixing foam blocks, invert panel to look like photo to the left.

Press boards into each other making sure to stagger seams. See photo and illustration.

The average two-man crew can complete 100-125 sq. ft. per hour, 800-1,000 sq. ft. per day.

Leave 1/2" gap at walls.

Floor is complete when you reach walls or your desired size.