-
STEP 1
Prime the floor
Floor must be fine sanded, clean, dry, free of dust, grease, oil and wax. Temperature should be in 68°-78° F. range. Thoroughly shake primer jug. Apply evenly across properly prepared floor using applicator suppled with the FloorShield
Maintenance System. Let dry for 1 – 2 hours. If grain is raised, lightly sand. Repeat application process.
STEP 2
Finish the floor
Use the applicator(s) supplied with the Floorshield Maintenance System to apply 2 coats to the floor. One coat is applied north/south, the second coat is applied east/west. When applying the finish, do not put pressure on the applicator. Each bottle of finish covers 500/sf for 2 coats. You must apply the 2 coats of finish in the same day. Please allow up to 4 hours before applying the second coat. Allow 24 hours to pass before dancing on the floor. Do not use fans or forced air to dry the finish. Allow for natural drying time.
Option for 2nd Time Use Of FloorShield
Maintenance System
If you already have used the FloorShield
Maintenance System previously, you will not need to strip the floor. You will receive a burgundy pad to scuff the floor. Place the pad onto a floor machine and use dry. Do not use with any liquids. Make sure you scuff the entire floor.
Once finished scuffing, you will need to do a warm water rinse to clean the floor of the residue. Allow the floor to dry. Next, you can move to Step 2 above.